Painting units
| Line item | Unit | How it is usually priced |
|---|---|---|
| Surface prep – patch, sand, caulk | hr | Per hour |
| Walls – 2 coats eggshell | sq ft | Per sq ft of wall, by number of coats |
| Ceilings – 1 coat flat white | sq ft | Per sq ft |
| Trim and baseboards – semi-gloss | ln ft | Per linear foot |
| Doors, both sides | ea | Per door |
| Paint and supplies | lot | Lump sum (taxable materials) |
| Furniture moving and floor protection | job | Lump sum |
Write down what the client cannot see
- Number of coats and sheen for each surface.
- How many colors are included and the price of each extra color.
- Prep that is included – and what is not (wallpaper removal, major drywall repair).
- Who moves furniture; how floors are protected.
- Brand and product line of the paint.
Download this template
Prefer to work offline? These files are made by our own build script from the same template – the Excel file has working formulas.
WORD · .DOCXPainting estimate templateEditable in Word, Google Docs, Pages or LibreOffice
EXCEL · .XLSXPainting estimate templateLine totals, sales tax and total calculate themselves
PDF · PRINTABLEBlank painting estimate template formUS Letter, to fill in by hand on site
FAQ
How do painters measure wall area?
Room perimeter × wall height, minus large openings. A 12 × 14 ft room with 8 ft walls has 416 sq ft of wall before openings.
Should paint be a separate line?
Yes – clients often ask about paint brand and cost, and in many states materials are taxable while painting labor may not be.
What about lead paint?
For homes built before 1978, EPA's Renovation, Repair and Painting rule requires certified firms and lead-safe work practices when painted surfaces are disturbed. Mention it in the notes when it applies.
Related templates and guides
TemplateFree estimate templateItemized job estimate with the "estimate, not fixed price" wording.TemplateContractor quote templateRemodel quote with subs, allowances and draws.TemplateJob estimate templateWork estimate for one job: tasks, hours, materials.TemplateHandyman estimate templatePunch list with per-task prices and trip charge.GuideHow to write a quote9 steps from scope to signature.GuideSales tax on a quoteGoods vs services, states, how the tool calculates it.