A contractor quote that wins the job
Homeowners compare three quotes that rarely cover the same scope. Yours wins when it is the easiest to understand: one line per trade, allowances in dollars, and a short list of what is not included.
| Line item | Unit | How it is usually priced |
|---|---|---|
| Demolition and disposal | job | Lump sum |
| Plumbing – relocate drain, new valve | job | Lump sum (sub quote) |
| Electrical – GFCI circuit, fan and vanity light | job | Lump sum (sub quote) |
| Cement board and waterproofing | sq ft | Per sq ft |
| Tile installation – floor and shower walls | sq ft | Per sq ft, allowance stated |
| Vanity, toilet and fixtures – allowance | lot | Allowance |
| Paint, trim and accessories | job | Lump sum |
| Permit | ea | At cost |
License, permits and home improvement rules
- Put your state license number on the quote – Florida requires it on every offer, proposal, bid and contract; California requires it on contracts and bids.
- Say who pulls the permit and that the price includes inspection fees (or not).
- Residential remodels in many states need specific contract language (cancellation rights, payment schedule, start and completion dates). Once accepted, a quote may become that contract – check your state's home improvement rules.
- Sold at the client's home? The federal 3-day Cooling-Off Rule may apply.
Details and sources: US rules for quotes and estimates.
Download this template
Prefer to work offline? These files are made by our own build script from the same template – the Excel file has working formulas.
FAQ
What should a contractor quote include?
Scope by trade, materials and allowances, permit responsibility, schedule, payment schedule, exclusions, change-order rules, your license number and a signature block.
How much deposit can a contractor ask for?
It depends on the state. California, for example, limits the down payment on home improvement contracts to 10% of the price or $1,000, whichever is less. Check your state's contractor board.
Do I need to list subcontractors?
Not by name, but listing plumbing and electrical as separate lines shows the client the licensed trades are included and makes change orders easier to price.